As Principal Contractor we were responsible for all site management and construction of a new sheet piled retaining wall within a domestic curtilage.
The project called for liaison with Cadent as there was a gas main buried in the path above the site that needed monitoring during the piling works. Vibration monitoring was completed to demonstrate to neighbours that our works would not affect their properties.
Site access was steep and restricted which necessitated careful mobilisation and demobilisation of the large piling rig and sundry plant and equipment. A well was discovered during the works that needed to be correctly filled in before demobilisation.