The Client was required to expose elements of their large diameter pipework to allow for inspection, where internal devices (“pigs”) could not reach, to ensure the structural integrity of the pipework. Most of the locations were inaccessible to machinery and therefore everything had to be completed by hand. We worked with the engineers to develop a Temporary Works design that allowed for manual construction of the support structure. The client was pleased with the high standards of safety achieved on the excavations.