Contract was awarded to construct a new control room for a railhead gas condensate terminal. Works included a substantial in-situ concrete basement structure, incorporating a sheet piled contiguous wall, steel portal frame with blast proof elements. A full office fit out was then completed. As with any old industrial site, there were numerous obstacles buried in the ground, which needed discovering, removing or moving to enable construction to commence.