Supporting the Principal Contractor with the installation of new fibreglass gas quality kiosks. Works included new concrete kiosk bases, new surface troughs, new buried ducts under roads, cable tray supports and the deconstruction of old kiosks as part of a project to increase the accuracy of monitoring the gas quality coming into the terminal.

Mackinnon Construction were awarded the contract to install a new medium pressure pipeline from a gas terminal to a gas bottling plant. Works included, new fencing, excavations, road excavations and reinstalling surface, forming openings in walls, pipe supports and other gas infrastructure to support the installation of a medium diameter gas main.

To keep gas flowing to peoples homes and businesses demands a network of large diameter gas mains (36″) to be maintained. These mains are generally buried underground and therefore to complete any maintenance on them requires deep excavations to be undertaken. Mackinnon Construction were awarded the contract to provide the excavations and safe access to the pipes in various locations in Norfolk and Suffolk. Works included, liaising with landowers, the provision of temporary roadways, security fencing, deep excavations, safe access stairs and working platforms for others.

As Principal Contractor we were responsible for all site management and construction of a new sheet piled retaining wall within a domestic curtilage.

The project called for liaison with Cadent as there was a gas main buried in the path above the site that needed monitoring during the piling works. Vibration monitoring was completed to demonstrate to neighbours that our works would not affect their properties.

Site access was steep and restricted which necessitated careful mobilisation and demobilisation of the large piling rig and sundry plant and equipment. A well was discovered during the works that needed to be correctly filled in before demobilisation.

As Principal Contractor we were responsible for all site management and construction work activities including the construction of new reinforced concrete fuel tank bunds, reinforced concrete access roads and hardstandings, road kerbing, underground cable ducting, relocation of the client’s portable office accommodation, perimeter security fencing, foul and surface water drainage including the installation of a deep underground 12,500 litres full retention separator tank and a penstock chamber. The contract also included maintaining the client’s access to the existing fuel tank farm during construction activities, several night and daytime contract lifts that had to be liaised with the operational Norwich International Airport to prevent any hazards to aircraft, full independent access scaffolding around the new fuel tanks, deep and high water table excavations and the successful avoidance of numerous unidentified buried live mains utility services.

The client provided us a with a large excel spreadsheet hghlighting all the works that were required at over 1600 locations throughout the East of England. It soon became clear that it would not be possible to run a large project on a spreadsheet, so with the support of the Client we introduced an app based platform to help direct teams to the right locations and give them the correct details as to what jobs were required upon arrival. The app was also able to geographically display which locations had been visited, giving the Client visibility of project progress. By harnessing technology we were able to be more productive and provide comfort to the Client that all works had been completed to the expected standard.