Mackinnon Construction were awarded the contract to construct a large reinforced concrete lathe base inside an existing factory building. The design called for a set of intricate “box-outs” to be cast very precisely into the surface of the slab to allow for the machine to be correctly sited. The site was quite close to the river, which meant that great care had to be exercised in excavating the slab foundation whilst keeping the working area dewatered.
The Client was required to expose elements of their large diameter pipework to allow for inspection, where internal devices (“pigs”) could not reach, to ensure the structural integrity of the pipework. Most of the locations were inaccessible to machinery and therefore everything had to be completed by hand. We worked with the engineers to develop a Temporary Works design that allowed for manual construction of the support structure. The client was pleased with the high standards of safety achieved on the excavations.
The North Norfolk coastline is one of the most dynamic marine environments in the UK and its sand dunes and cliffs are constantly being eroded. At some locations along the coast, various sea defences have been put in place. Mackinnon Construction has experience of installing sheet piles, timber groynes, concrete aprons and stone gabions.
The project involved linking two gas terminals to increase the service life of the processing area. Works included installing a large vent stack base in the middle of the process area as well as a large number of plinths and concrete bases to support the new pipework.
A new printing press was due to installed and required a special foundation inset into the existing floor of the factory. Works included breaking out the existing floor and piling and installing the new foundation which included cast in-situ steps and changes in height to accommodate the press.
We were contracted to construct several tank bunds and also large in-situ concrete troughs for fluid containment across a working chemical plant. The site is a Tier 1 COMAH site which required a high level of attention to detail on safety and processes to ensure that the project ran on budget and schedule.