We were contracted by the developer to construct 12 new homes on an edge of village site in Brancaster. Two units were allocated for social housing and the other units open market. Construction was punctuated by the Covid Pandemic which led to material shortages and special measures to ensure the health and safety of the site team. These challenges were overcome and the development was completed to a high standard. Works included traditional flint elevations which enabled the homes to blend into their surroundings.